Core Workflow
Interactive Planner

Start Vessel Mobilization

Select the systems being mobilized. SPH builds the controlled preparation, calibration and verification document set for the vessel.

Procedure Library
1. Select systems
0 systems selected
2. Generated mobilisation plan
PHASE 01

Plan & Receive

AAA110
AAA527
AAA212
PHASE 02

Install & Integrate

AAA110
PHASE 03

Configure

PHASE 04

Calibrate

PHASE 05

Verify

PHASE 06

Survey Ready

AAA238
Controlled document pack
AAA110
AAA527
AAA212
AAA238
Open documents
3. Survey Ready Gate
Equipment received, identified and inspected
Mechanical installation and cable routing complete
Power / UPS / network / serial interfaces verified
Offsets and coordinate conventions controlled
Required configuration applied and recorded
Calibrations completed and acceptance evidence retained
Time synchronization and data logging verified
Operational procedures and backup workflow available
Punch-list reviewed and critical items closed
Survey team confirms system ready for operations

SPH planning aid only. Controlled company procedures, OEM manuals, project requirements and approved risk assessments remain authoritative.